747-8F / 747-400F – Working with the cargo holds (1) – Neo engines release date
Hello all, After starting to make the first units of the LEAP-1A and A350 sharklets I was able to continue working on the B747-8F/-400F project. I made the three basic parts that are inside the tail cone, these parts will be assembled directly inside the kit’s tail, so the rear wall, the ceiling and the floor are both glued together but not attached to the cone. I also started the cargo holds, the aft hold. Everything is very tight, it really was luck that the thickness of the deck matched the ceiling of the cago hold (although I did an …