Back from holidays, project updates

Hello everyone, First entry of September after the summer holidays, hopefully everybody is doing alright, now that we are leaving behind these hot days of summer, it is time to continue working hard. I would like to comment on the current projects, future ones and minor changes within the online shop. I would like to start with the 1/200 GSE models: The units of the 1/200 AST-1 pushback have been out of stock for a long time now, so new units are going to be produced alongside the 1/200 Belt loader which is finally finished. During these days I have …

Back from holidays, project updates Read More

1/200 Belt loader finished – I’ll be back in September

Hello everyone, This will be my last entry till I am back in September, as I mentioned earlier, I want to take some days off, I will continue to ship orders as usual and continue to work on stuff and hopefully I will be able to bring news when I am back in September. I need some time to get myself recharged as summer is very hard for me where I live, it affects me physically, mentally and also affects the materials that I use, so I think it is a good time to try to cool down, make some …

1/200 Belt loader finished – I’ll be back in September Read More

747-8F/-400F FWD lowerdeck cargo floor and Belt loader 1/200 update

Hello everyone, I have been progressing a little bit more on current projects while also trying to adjust a few other things about the current GSE models, more than adjusting, simply re arranging things so that it could be a bit easier to produce/pack them. On regards the 747 cargo project, both fuselages are now at the same step, the sidewalls are smooth so I expect to do something with them to imitate the lining. The deck that you can see for the FWD cargo holds is actually my second attempt, as I did one the other weekend, now I …

747-8F/-400F FWD lowerdeck cargo floor and Belt loader 1/200 update Read More