Today I want to share a very little progress that I am doing with the Forward cargo hold on the 747-8F (at the moment, the -400F will be coming later).

I have been studying carefully the reference photos that I could find as well as a very extensive manual. So far I am trying to reproduce everything that I see from the 1/1 model, for example, the ball rollers of the loading platform are the same number than that of the real aircraft.

The structure panels have this kind of insulation texture, although I am at the moment thinking about making them a bit thinner. There is still some work to do which I expect to do between today and tomorrow, because my goal is to test fit it this weekend on the model.

These photos are a work in progress so I am at the moment working mainly on the platform. To my surprise, to floor is not flat, manual indicates two walkways which are also the place for some sort of wheels, so basically you can see through the airplanes interior and see the structure. Rail tracks and such are placed on top of these structure sections.

So this is how at first, I would like these parts to fit, the fuselage will have the inbuild sidewalls and then the rail system which also includes the entry platform and structure will be placed inside during the building process. If you recall that white plastic floor I showed on the previous entry, this printed part will take its place.

That is all for now, I hope that if things go well I can do some more progress this weekend, I also need to advance with the other fuselage.